The City Wastewater Treatment Plant is located at 209 North Ohio Street.
Wastewater Treatment Plan
209 North Ohio Street
Greenville, Ohio 45331
Contact our office
Phone: (937) 548-3530
Fax: (937) 548-3596
Personnel
| Wastewater Superintendent | |
| Maintenance Operator | |
| Operator/Laboratory Technician | |
| Operator in Training / Maintenance | |
The oxidation ditch plant is designed to provide for preliminary, primary, secondary and advanced treatment, with disinfections of effluent discharged into the Greenville Creek which joins the Stillwater river in Covington, Ohio. The WWTP has a 3.5 million gallon per day (MGD) design flow, 6.02 MGD peak hour flow, and 7.21 design storm flow. Average daily flow is equivalent to 2.2 million gallons. Approximately .257 dry tons of biosolids are produced per day. The facility is staffed on first shift daily.